We are keen to cooperate with our esteemed clients to develop the local market and build a mutually beneficial business relationship. If you would like to know more, please do not hesitate to contact us at [email protected].
Yes, we offer OEM/ODM services. If you have specific requirements, please do not hesitate to contact us. We would be happy to provide professional proposals and help design the perfect relay for you.
For different markets, we get our products approved by cURus, UL, CE, RoHS, TUV, EAC, UKCA, CSA, CQC, CP, and other standards organizations, to meet the needs of those markets.
We would provide some free samples for testing, and you would only need to pay the express shipping cost.
12 month in use and 18 month in stock.
To meet customer demands, we are also manufacturing protection modules, plastic clamps, metal clips, ID tags, and bus jumpers.
If there is stock we can send it right away.
It depends on the type of product you choose.
If you’re interested in our products, you can either buy them from our online store or get in touch with our sales department at [email protected].
For general electrical appliances, it’s important to think about the required volume, including cabinet space and circuit board layouts. Additionally, for small items such as toys and remote control devices, subminiature relays should be employed. Making sure you choose the right relay is critical for the proper functioning of your electrical system.
PLC relay technology has developed to the present and has been combined with computer technology to produce programmable controller technology. PLC for short. It is a kind of advanced equipment that directly uses microcomputer technology for automatic control.
It has the advantages of high reliability, strong anti-interference ability, complete functions, small size, flexibility and expandable, simple software, easy maintenance, beautiful appearance, and so on.
In the past, elevators controlled by relays had hundreds of contacts to control the elevator’s movement. If the contact connection is not good, it will cause failure and maintenance is quite troublesome. In a PLC controller, there are hundreds of solid state relays, and dozens of timers/counters, with power off memory function, input and output using photoelectric isolation, control system fault is only 10% of the relay control mode. Because of this, the relevant state departments clearly stipulated that since 1997, the new elevator shall not use a relay control elevator, using a PLC microcomputer control elevator.
It can be seen that relay technology is ubiquitous in daily life, and the close combination with the computer enhances its vitality so that the relay can better serve our life.
When the secondary circuit of the CT in operation is open, the secondary current becomes zero and the degaussing effect disappears. At this time, all the primary current is used for excitation, which induces high electromotive force in the secondary winding, and its peak value can reach several thousand volts, which seriously threatens the safety of personnel and equipment.
In addition, the magnetization force generated by the primary winding makes the iron core suddenly saturated and the active power loss increases, which will cause the iron core to overheat and even burn the current transformer. Therefore, the secondary circuit of the CT is not allowed to be opened during operation.
A single-phase ground fault current is greater than a three-phase short-circuit current when the zero-sequence integrated impedance at the point of faulting is less than the positive-sequence integrated impedance. This phenomenon can be observed in a variety of electrical systems.
Although the generator excitation circuit is grounded at one point, it will not form a fault current path, which will cause direct damage to the generator, but the possibility of second point grounding must be considered. Therefore, the single-point grounding protection sends a signal to strengthen inspection and monitoring.
When a two-point grounding fault occurs in the excitation circuit of the generator, the generator rotor will be burned out because the fault current flowing through the fault point is quite large. Due to short circuit in some windings, the current in the magnetic field windings will increase and may be burned out due to overheating. Winding short circuit, resulting in air gap magnetic flux out of balance, resulting in unit vibration. Steam turbines can also magnetize shafting and steam turbines.
Therefore, the two-point grounding protection should be adopted after the one-point grounding. In this way, when the two-point grounding occurs, the operation will be stopped after a delay.
In the calculation of the relay protection setting, the maximum and minimum operation modes of the power system must be considered.
Maximum working mode refers to the working mode in which the system equivalent impedance is minimum and the short circuit current through the protection device is maximum when the protected object is short-circuited.
Minimum operation mode refers to the operation mode in which the equivalent impedance of the system is maximum and the short circuit current through the protection device is minimum under the same short circuit condition.
In order to ensure the accuracy of the distance measure voltage, an additional AC quantity must be passed as a reference when forming the action amount of the distance relay. This nominal AC value is used for detecting Uph phase inversion when a fault occurs either inside or outside the protection zone and is often referred to as the polarization quantity of the distance relay.
The drive mode of the coil is shown below:
We usually accept T/T (100 %)
Shanghai and Ningbo.
We provide numerous shipping methods including sea freight, air freight, land freight, and express. You can choose from popular carriers such as UPS, FedEx, DHL, and TNT.
Express is typically a faster shipping option, with most deliveries taking place within 7-14 days.
We recommend you select a reputable freight forwarder and allow them to handle your shipment. We will be in touch with them to coordinate delivery.
We only accept RMB, USD and EUR.